Blast mitigation,
Energy conservation
Square feet of film installed – 87,569
Number of windows protected – 3,300 panes
Two-sided mechanical attachment system
8-mil fragment retention film with sun protection properties
Commercial Window Shield was chosen to install fragment retention film on all the windows at the Department of Energy headquarters building in Washington. The James Forrestal Building, as the structure is known, is one of the most well-known buildings in the nation’s capitol. Assigning the project to Commercial Window Shield was made easy because the company has a GSA contract number.
The project involved applying security film to the inside surface of nearly 4,000 panes of glass. Most of the work was done by attaching the film to the window frame using Commercial Window Shield’s Blastight Film Attachment System. Some areas were not suited to the mechanical attachment, so the company used its wet-glazed system, which involves using Dow’s 995 structural silicone. Both of applications met GSA’s strict requirement for level C buildings.
Monitor your website's performance and resource usage in real-time.
Click "Start Tracking" to begin monitoring page load events and resource performance. The system will track all network requests, loading times, and user interactions to provide comprehensive performance insights.
Real-time mode is now active and continuously monitoring all page load events.
No page is currently set for real-time tracking.
During this session, the page will automatically perform hard refreshes to replicate genuine user interactions and ensure all resources are fetched from the server in real conditions. This allows for precise measurement of load performance and real-time data accuracy.
Your real-time performance tracking session has been successfully completed. All page load events, resource measurements, and user interactions have been captured and analyzed.
The comprehensive performance data is now being processed and will be available in your dashboard shortly.