Building Solutions


 

Chooser

image goes here


Houston Metropolitan Transit Authority
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
READ MORE

Edwards Air Force Base
As the originator of America's first jet powered flight as well as numerous other landmark events in aviation, Edwards Air Force Base has been at the forefront of flight innovation for more than fifty years.
READ MORE

Ernst & Young - Corporate Headquarters
Situated at a prime location in Midtown Manhattan, Ernst & Young, LLP contracted to have a vulnerability assessment performed on the building they occupy at #5 Times Square.
READ MORE

U.S. Capitol Building
Commercial Window Shield was interviewed several times (along with many other companies) to judge whether we were capable of handling the installation of fragment retention film to arguably the most important building in the world.
READ MORE

DOE Installs Security Film
The exterior facing glass of the Department of Energy headquarters building ­ The James Forrestal building - in Washington, DC is being protected by security film applied to the interior surface of the glass.
READ MORE

Pentagon Force Protection Agency (PFPA)
From March 2002 through August 2003, Commercial Window Shield has supplied and installed fragment retention film to more than 16,900 panes of glass ­ nearly 500,000 square feet.
READ MORE

FBI Installs Security Film
The exterior facing glass of the J. Edgar Hoover FBI headquarters building in Washington, DC is protected by security film applied to the interior surface of the glass.
READ MORE

Pentagon
The exterior facing glass of the Pentagon building in Washington, DC was protected by Fragment Retention Film when the terrorist struck the building on September 11, 2001.
READ MORE

Veterans Administration
Commercial Window Shield was awarded a contract to supply and install fragment retention film to all exterior windows in the department of Veteran's Affairs headquarters buildings in Washington, DC.
READ MORE

GSA Contract


Quotes from the project manager for the work we did at the DIA Headquarters at Bolling, AFB.

"I feel that everything is in place and we'll do everything we can to ensure a smooth start for Dec 4th. Thank you"

- Susannah T. Finch
P.E.